Hi,
I've been having a bit of a problem with Maximizer Enterprise 9 for a while now and haven't had much luck solving it. We are using the Pervasive version with Outlook 2003/Exchange with the Maximizer email composer.
Every now and then when we send emails Maximizer doesn't save the date correctly. When referring back to the email in future the date the email was sent always appears as the current date. The date on the document view is correct, but actually viewing the email or attempting to reply/forward it brings up the incorrect date.
Has anyone else seen this problem? Any help would be greatly appreciated.
Original Post